FineTek
EEX Electromechanical Level Measuring System
EEX Series
- With 2-points high/low alarm settings; output contact: 3A/250Vac SPDT.
- LED digital display.
- 4~20mA analog current signal output.
- Warning alarms when disconnected or when materials are buried.
- Choose manual or timed start-up.
- Communication interface: RS 485 (MODBUS).
- Detection accuracy:10mm/pulse.
- Application: ore, clinker, coal, cement, grain, plastic powder, feed, granules, and any liquid.
JFR FMCW Radar Level Transmitter
JFR Series
- Non-contact measurement.
- Can measure corrosive and toxic liquids, hydrocarbons, and mud.
- Unaffected by changes in specific gravity, pressure, temperature, viscosity, foam, and dust.
- 4-20mA / 4 wires / 2 wires.
- FAS software can be used to set the meter via PC.
- Communication interface: RS 485 (MODBUS).
EST - Total Solution for Grain Silo Storage Management System
Digital signal of the thermosensor can be directly converted to RS-485 signal through FineLink (local display type) to IPC. Comparing to other competitors, FinwTek's sensor doesn't need a Master device to integrate the signal.
FineLink (local display type) can support maximum 8 units of EST110. This design can save unnecessary expense on the equipment and wiring job. On-site signal checking function can help to prevent wrong wiring and protect electrical parts.
- On-site monitoring and self-diagnosis function
- Support max. 8 units of EST110 temp. sensor
- Allow max. 30 points of temp. sensor in 1 EST110
- Convenient wiring and troubleshooting
- Fuse protection preventing any electrical risk
- IP67 rating available for outdoor use
System Requirements
- Central processing unit (CPU) P4 1GHz above
- Memory RAM 512MB above
- Operating system Microsoft Windows 2000 above
- Atleast 1GB idel hardware space for database
- RS232 or USB
System Advantages
- Open and flexible system. Comparing to other competitors, no need for extra cost/equipment if user would like to add new sensors. Exist system could be perfectly expanded
- Individual system, to keep IPC operating in the best condition.